SUMMARY
- 1. Drilling Crew
- Corrosion Control
- 3. Non Destructive Testing -NDT
- Welding & Steelwork
- Lifting Gear Inspections
- Drops Surveys
- Reporting Template
DRILLING CREW
- Personnel Manning
- Visa & Immigration Assistance
- Flights & Travel Planning
- HR Services molded to your mode
CORROSION CONTROL
- More Cost-Saving than Scaffolding
- Anti Corrosion Control System
- UHP Blasting | Grit Blasting | Mechanical Prep
- Airless Spray Application
NON DESTRUCTIVE TESTING
- UT | MT | PT
- Ultrasonic Testing Magnetic
- Testing Penetrant
- Testing Eddy Current
- Vinyl Spray
WELDING & STEELWORK
- Fabrication | Installation | Commissioning
- Electrical | Mechanical | Procurement
LIFTING GEAR INSPECTION
- Crane Inspections
- Non Destructive
- Testing Derrick
- Inspection Dropped Object
- Inspection Load Testing
DROPS SURVEYS
- Rope Access in Combination with
- Falling Object Inspections
Work Completed
Legwell Port:
- Three-man applications team
- 14 Days
- 360 m²
Starboard:
- Three-man applications team
- 14 Days
- 360 m²
Forward:
- Three-man applications team
- 14 Days
- 360 m²
Hull:
- 57 Days
- 1832 m²
- Degrease
- Mechanical Prep
- Strip Coat
- Intermediate Coat
- Top Coat
- Category
- IndustryLaboratory
- Location
- Mozambique
- Year
- 2016
- Service
- Petroleum and Gas
- Project
- Ensco / Valaris