West Gemini 

Reactivation and Upgrades

Client: Total
Location: Namibia, Offshore
Project Year: August 2017 – April 2019

Rope Access at Nikham Energy

West Gemini Reactivation and Upgrades
West Gemini Reactivation and Upgrades

Project Summary

Nikham Energy was selected by Total to manage the reactivation and upgrades of the West Gemini, one of the most advanced ultra-deepwater drillships operating in the region. The West Gemini is a vital asset in Total’s offshore operations, designed for deepwater drilling with cutting-edge technology and high operational efficiency.

This project was crucial for ensuring that the West Gemini was fully operational and capable of meeting the demands of modern offshore drilling. The reactivation and upgrades enhanced the vessel’s performance, safety, and reliability, enabling it to continue serving in Total’s high-stakes drilling campaigns.

Work Scope

The scope of work for the West Gemini project involved several critical services provided by Nikham Energy:

  • Manpower: Nikham Energy deployed a team of highly skilled professionals to handle the various technical tasks involved in the reactivation and upgrades. The team’s expertise ensured that all aspects of the project were executed to the highest standards.
  • Maintenance: Comprehensive maintenance services were performed across the vessel, focusing on key systems and components. This included routine checks and repairs, as well as more extensive upgrades to critical systems to ensure peak operational performance.
  • Elevator Inspection: A detailed inspection of the vessel’s elevators was conducted to ensure their safety and functionality. This was a vital part of the overall upgrade process, as the elevators are crucial for the safe and efficient movement of personnel and equipment within the drillship.
  • In-House Logistics: Nikham facilitated all logistics internally, ensuring a seamless flow of materials, personnel, and equipment necessary for the project’s success. This in-house management allowed for greater control over timelines and resource allocation.

Outcome

The project was completed within the specified timeframe, with the West Gemini fully reactivated and upgraded to meet Total’s rigorous operational standards. Nikham Energy’s involvement ensured that the drillship was restored to optimal condition, ready for deployment in challenging offshore environments. The successful execution of this project further solidified Nikham Energy’s reputation as a reliable and innovative partner in the energy sector.